Example Drafting of AMDAL and UKL UPL Documents

Example Drafting of AMDAL and UKL UPL Documents

Image source: http://3.bp.blogspot.com/-kzHbED8f04M/UpL5CPJoWjI/AAAAAAAAAPU/NTSICithq4E/s1600/Vintage+Wedding+Invitations25.jpg

AMDAL CONSIST OF:

– REFERENCE FRAMEWORK

– ANALYSIS OF ENVIRONMENTAL IMPACT (ANDAL)

– ENVIRONMENTAL MANAGEMENT PLAN (RKL)

– ENVIRONMENTAL MONITORING PLAN (RPL)

STAGE OF AMDAL STUDY:

A. IDENTIFICATION OF ACTIVITIES AND PRINCIPLES OF THE ACTIVITIES OF THE INITIAL ENVIRONMENT THAT WILL CONSIDER IMPORTANT IMPACT

B. IDENTIFICATION OF ENVIRONMENTAL COMPONENTS WILL BE IMPACTED

C. ESTIMATE OF ENVIRONMENTAL RONA RANGE DUE TO ACTIVITIES PLAN (IMPORTANT IMPORTANCE OF IMPACT)

D. IMPORTANT IMPACT EVALUATION

E. RKL AND RPL RECOMMENDATION FOR THE EXPOSURE IN MANAGEMENT AND MONITORING OF ENVIRONMENTAL IMPACTSPolicy Flow:

AMDAL> ENVIRONMENTAL STATEMENT> WORK PROJECT> RKL & RPL OPENED

AMDAL CONDITIONS IN INDONESIA AT THE TIME

VIEWS AND COMMITMENTS OF FAMILY

– AMDAL And its implementation is seen as cost center

– There are no incentives or sanctions for initiators who:

– Arranged by not compiling AMDAL (although classified as AMDAL

– Prepare AMDAL correctly and well with the origin so

– Implement AMDAL dg who does not

– Not knowing any difference of benefit if AMDAL is prepared as part of feasibility study dg when arranged afterwards

IN THE PART OF THE GOVERNMENT APPARATUS- AMDAL is considered more simply as a licensing instrument than as an environmental management instrument

– Doc. The AMDAL should include as much detail as possible the environmental management and monitoring efforts

– Limited human resources capable of assessing AMDAL

– AMDAL is still viewed as an economic commodity by government officials, initiators or consultants

VIEW OF AMDAL PREPARATIONS

– AMDALs will be better developed when the data and information on the planned business and / or activities are fully available

– RKL is addressed to all important environmental components affected

– RPL is addressed to all components of the environment that are impacted and are not limited to certain components that are sensitive indicators

POLICY, REGULATION OF THE INVITATION AND ITS ENFORCEMENT

Weak law enforcement for:

– Businesses / activities that do not prepare AMDAL (although including mandatory AMDAL)- Efforts / activities that do not implement the results of AMDAL

UKL-UPL (ENVIRONMENTAL MANAGEMENT ENVIRONMENT AND ENVIRONMENTAL MONITORING PLAN)

– UKL-UPL DOCUMENTS MADE IN THE PROJECT PLANNING PHASE AS ESTABLISHMENT IN LICENSING WITHOUT LICENSING

– FOR BUSINESS / ACTIVITIES YG HAVE WALKED BUT HAVE NOT HAVE UKL-UPL IS DONE FOR DPLH (Environmental Management Document)

– MADE FOR PROJECTS WHICH ENVIRONMENTALLY IMPACTED, THE SCALE CONTROLLESS AND NOT COMPLEXING

UKL-UPL FORMAT ACCORDING TO THE REGULATION OF THE MINISTER OF ENVIRONMENTAL STATE ENVIRONMENT NUMBER 13 YEAR 2010 CONCERNING ENVIRONMENTAL MANAGEMENT EFFORTS AND ENVIRONMENTAL MONITORING PLACES AND LETTERS OF STATEMENTS OF MANAGEMENT AND MONITORING OF LIFE ENVIRONMENT

Appendix II

Regulation of the State Minister of the Environment

Number: 13 Year 2010

Date: May 7, 2010

FORMAT FOR ENVIRONMENTAL MANAGEMENT EFFORTS AND ENVIRONMENTAL MONITORING PLAN (UKL-UPL)UKL-UPL contains at least the following:

I. THE IDENTITY OF THE COMMISSIONERS

1. Company name: ________________________________

2. Name of initiator: ________________________________

3. Office address, phone / fax number: ________________________________

II. BUSINESS PLAN AND / OR ACTIVITY

1. Name of business plan and / or activity: ___________________________________

2. Location of business plan and / or activity: ___________________________________

Information:

Write down the location of the business plan and / or activity, such as: the name of the road, the village, the sub-district, the district / city and the province where the plan will be carried out and / or activities. For

activities that have a large scale of business and / or activity, such as mining activities, need to be equipped with an adequate scale of activities (1: 50,000 if any) and location based on Latitude and Longitude.3. Business scale and / or Activity: _______________________ (units)

Information:

Write down the size of the area and / or length and / or volume and / or capacity or other quantities that can be used to give an idea of ??the scale of the activity. For example, among others:

1. Industry Sector: production type and capacity, amount of raw and auxiliary materials, amount of energy use and amount of water usage

2. Mining Sector: land area, reserves and quality of mining materials, length and extent of seismic test track and number of explosives

3. Transportation Sector: the area, length and volume of transportation facilities to be built, the depth of moorings and the weight of the boat dock and other measures corresponding to the field

nexus

4. Agriculture: broad business plan and / or activity, capacity of processing unit, amount of raw and auxiliary materials, amount of energy use and amount of water use

5. Tourism sector: the area of ??land used, the area of ??the tourism facility to be built, the number of rooms, the number of laundry machines, the number of holes, the seating capacity of the entertainment venue and the number of restaurant chairs

4. Outline of the Business and / or Activity Plan Components

Write down the components of a business plan and / or activity that are believed to have an impact on the environment.Writing techniques can use a description of the activities at each stage of project implementation, namely the pre-construction, construction, operation and post-operation stage or by describing the components

activities based on the process ranging from handling raw materials, production processes, to post-production handling.

Example: Livestock Activities

Preconstruction Phase:

a. Land acquisition (explain briefly the extent of land cleared and land status). B. and others

Construction Phase:

a. Land clearing (brief description of land area, and land clearance technique).

b. Construction of cages, offices and mess employees (explain the extent of the building).

c. and others..

Operation Phase:

a. Livestock import (write down the number of livestock to be included).b. Livestock raising (describe stages of raising livestock, or impact on the environment).

c. and others

(Note: Especially for large scale business and / or activities, such as: paper industry, textile, etc., enclose also process flow diagrams accompanied with material balance and water balance (mass balance and water balance)

III. ENVIRONMENTAL IMPACT THAT WILL HAPPEN.

Describe briefly and clearly on:

1. activities that are the source of the impact on the environment;

2. the types of environmental impacts that occur;

3. size indicating the magnitude of the impact; and

4. other things that need to be addressed to explain the environmental impacts that will occur on the environment.

5. Summary of impacts in tabulation form as below:

SOURCES OF IMPACT OF IMPACT OF IMPACT OF FACTS(Write down activities that produce an impact on the environment) Example:

Livestock Operations in Operation Operation Livestock raising generates waste in the form of:

1. Liquid waste

2. Solid waste (dirt)

3. Gas waste due to burning of cattle waste

Example:

The occurrence of water degradation of XYZ River due to disposal of liquid waste

Degradation of water quality of XYZ River due to solid waste disposal

Reduced air quality due to combustion (Write down the size that can state the magnitude of the impact)

Example:

The resulting liquid waste is 50 liters / day.The resulting solid waste is 1.2 m3 / week.

IV. ENVIRONMENTAL MANAGEMENT AND MONITORING PROGRAM

Describe briefly and clearly:

1. Measures taken to prevent and manage impacts including efforts to address and address emergencies;

2. Monitoring activities undertaken to determine the effectiveness of impact management and compliance with environmental regulations;

3. A benchmark used to measure the effectiveness of environmental management and compliance with environmental regulations.

V. SIGNATURE AND CAP

After the UKL-UPL is fully prepared, the initiator shall sign and affix the seal of the business and / or activity concerned.

Another note, can be seen on personal blogs.
email: wyuliandari (at) gmail.com